Gap, Redundancy, Reuse Analysis

The Gap Analysis within the Context of the Target Architecture

The earlier Target Architecture Strategy section introduced a vision of the desired Target Architecture End-State, at a five to seven year planning horizon.  Following that, the Segment Architecture Development Section introduced VA’s strategy for implementing business improvements and IT systems within a series of discrete segment architectures. Each of these segment architectures either optimizes resource sharing among a group of highly related business lines or defines a group of related sharable services for use across the enterprise.  The subsequent Target Architecture Transition Plan identified actions that the Office of Enterprise Architecture Management is taking to implement both the planned segment architectures and related IT investments which will result in achieving the desired target end-state.  This Gap, Redundancy, and Reuse sections identify what additional investments (and adjustments to investments) are required, within the forthcoming BY-2009 Portfolio to move VA toward achieving the target architecture end-state. 

Identification of Implementation Gaps and Reuse Opportunities

This Target Reuse, Redundancy and Gap Analysis section considers each of the ongoing projects within the current portfolio from the standpoint of sufficiency and completeness.  Wherever the Target Vision calls for a development activity that is not identified within a current project, a project-placeholder entry is provided.  Each project-placeholder entry is then discussed as a potential, new project within the following EA Portfolio Recommendations section, in order to bring the matter to the attention of VA's business-line stakeholders.  Project-Placeholder entries appear in Bold-Italic Typeface within the table.

Projects and project-placeholders are organized within the five target architecture layers and they reference their related segment architectures in the tables below.  The gap and reuse analysis proceeds as follows:

  • When a project is found to be incomplete a "gap" is identified and the omission is cited in the "Identify Potential Gap" column of the table;
  • When a project can possibly reuse existing sharable components or sharable data, or when the project is understood to provide sharable components or sharable data, for reuse in other projects, then those factors are documented in the "Identify Potential for Reuse" column of the table;
  • When there is a possibility to combine two projects or to subsume one project with another, because of duplication of effort, then that factor is noted within the "Duplication-Consolidation" column of the table.
  • When an entire project is missing, which would be required to complete the target end-state vision, then that unsatisfied requirement is identified in Bold-Italic-Typeface on a “missing-project-placeholder” line within the table;
  • Possible future IT requirements (which may be business-line pilot activities without specific IT requirements at present) are cited in the table and shown in Italic-Italic-Typeface, and are labeled "Possible Future-Requirement".

 

Service Access Layer

Initiative Identification

Reuse, Redundancy & Gap Analysis

Initiative Name

Related Segment Architecture

CPIC-Status Project-Status And Planned Deployment Date

Initiative Information Source & Information Date (Meta-Data)

Identify Potential for Reuse

Identify Potential Gap

Identify Possible Duplication and Consolidation with other Initiatives

Gap/Reuse Information Source & Information Date (Meta-Data)

One VA Contact Center  (EA-45)

Identity management Services Segment

Approved Budget

Re-Baselined Milestone-1,

Deploy-by: 9/2009

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

This Project will produce sharable data and contact management services which will then be available across all business lines and to other projects

 

VAMP (The VBA Application Replacement Project) EA-60  has been identified to utilize services provided by this  One-VA Contact Center Project

No Apparent Gap

The VBA/VBRS System Development Effort develops a common knowledgebase of VA benefit, service and process information (including State veteran program information) for answering veteran inquiries, to assure that veterans receive complete, correct, and consistent information on every call.

 

During 2006, VBRS was consolidated with the Contact Management Project.

EA V4.0

GAP Analysis Section

5/2005

 

EA V4.1

GAP Analysis Section

2/2006

 

BY-2008 Portfolio 9/2006

 

 

VHA VistA Imaging (EA-17)

“Proposed” Health Business Segment

Continuing Milestone-3

Deploy-by: 9/5/2011

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

This project develops an Imaging standard and sharable service technology that will apply to numerous Medical Imaging applications deployed  across all VA VISNs

 

These Imaging Services may have reuse potential within other Federal Health Care Systems therefore they will be posted within the Federal Transition Framework  Sharable Service Directory

No Apparent Gap

No Project Consolidation Potential

 

However, this project will retire many local, non-standard, legacy medical imaging support systems

EA V4.0 GAP Analysis Section

'5/2005

 

EA V4.1

GAP Analysis Section

2/2006

 

WEB

Presentation

Standardization

“Proposed” Information Services Segment

Not in CPIC

(Implemented thru O&M)

Deploy-by:

6/21/2006

VA Policy for Web Site Look and Feel

12/21/2005

Establishes a Web Look/Feel This standard applies  across all VA websites

No Apparent Gap

No Project Consolidation Potential

EA V4.1

2/2006

WEB

Content

Management

Standardization

“Proposed” Information Services Segment:

 

Not in CPIC

Implemented thru O&M

Deploy-by:

 7/1/2007

VA Directive 6102 Chapter 7 a/o 12/2005

Content Mgt Standard and COTS solution. This standard applies  across all VA websites

No Apparent Gap

No Project Consolidation Potential

EA V4.1

2/2006

Business Rule Implementation Layer

Initiative Identification

Reuse, Redundancy & Gap Analysis

Initiative Name

Related Segment Architecture

CPIC-Status Project-Status And Planned Deployment Date

Initiative Information Source & Information Date (Meta-Data)

Identify Potential for Reuse

Identify Potential Gap

Identify Possible Duplication and Consolidation with other Initiatives

Gap/Reuse Information Source & Information Date (Meta-Data)

VistA Laboratory Information System (EA-18)

“Proposed” Health Business Segment

Continuing

Milestone-1

Deploy-by:

9/1/2009

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

This project replaces the VHA Legacy Laboratory Service's IT system and its associated business processes.

The replacement system should interface with the Health Data Repository and with the RE-Veterans-Identification data store, providing data sharing and re-use opportunities in both areas.

No Apparent Gap

This project will create a patient-centric knowledgebase of laboratory information that will be accessible to all 158 VA healthcare facilities.  It will eliminate separate data stores at each facility.

 

EA V4.0

5/2005

 

BY-2007 Portfolio

9/2005

 

EA V4.1

2/2006

 

BY-2008 Portfolio 9/2006

VA Payroll Replacement System -

e-Payroll     (EA-34)

“Proposed” Financial Services Segment

 Continuing

Milestone-2

Deploy-by:

9/2009

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

Utilizes the PMA e-Payroll solution

 

Will be implemented for all VA employees and all VA locations

No Apparent Gap

No Project Consolidation Potential

BY-2007 Portfolio 9/2005

 

By-2008 Portfolio 9/2006

VBA Application Migration Project (VAMPS)        (EA-60)

This was an EA- Recommended Project in EA V4.1 (2/2005) which was subsequently adopted in 2006

”Proposed” Benefits Business Segment

This was an EA V4.1-proposed” project in 2007

It Has been initiated as the  new VBA Application Migration Project (VAMPS) at Milestone-0 and it will appear as a new investment within BY-2008

VA BY-2008 Portfolio

EA V4.2 VBA Project Architecture Initiative in 2006

This initiative will assure that the single authoritative data source, developed by the DIMHRS, RE and CM initiatives, will be accessible to all VBA legacy business systems.

This project addresses the requirement that was articulated in the “DIMHRS Proposed Gap Project” within     EA V4.1

 

This project resolves two gaps  which were identified in  the EA V4.1 Portfolio Recommendations, specifically:

1) A new project is required to remediate VA Legacy Business-Line Apps to receive & process veteran identification & demographic data that are altered by the DIMHRS VA/DoD data sharing initiative - this is addressed with an unfunded, optional task in VAMPS; and

2) A new project to integrate RE veteran identity data with existing VBA benefit applications - this is addressed with the base-level VAMPS task

No Consolidation Potential with other initiatives

EA V4.0

'5/2005

EA V4.1 2/2006

 

Project-Architecture Stakeholder Review 1/2006

VBA Data Centric Transition for VR&E and Education              (EA-59)

”Proposed” Benefits Business Segment

New Investment in BY-2008

Milestone-1 Deploy-by 9/2010

VA-BY-2008 Portfolio

EA V4.2 VBA Project Architecture Initiative in 2006

This project will provide a data-centric claim processing and document- imaging system for the Vocational Rehabilitation and Employment business line and for the Education business line.

 

This solution is designed to be shared by the remaining four benefit business lines

 

It will become a sharable service center within VA’s emerging SOA

No Apparent Gap

No Project Consolidation Potential

 

However, this project will provide a common claims processing and document imaging service which will be shared by all benefits business lines, thereby reducing the complexity and unique system development cost within each benefit business line

BY-2008 Portfolio

VHA Medical and Prosthetic Research             (EA-13)

“Proposed” Health Business Segment

Continuing Milestone-2

Deploy-by: 3/2009

Ex-300(2007)

92005

 

Ex-300(2008)

9/2006

 

This project provides a standard web-based management system for research proposals, grants and projects which will support an initial 15000 research projects across 115 VA medical facilities

 

Eliminates stovepipe legacy research grant processing systems at many local VA facilities.

 

No Apparent Gap

No Project Consolidation Potential

 

Many local legacy grants management systems are eliminated by this project.

EA V4.0

5/2005

 

BY-2007 Portfolio 9/2005

 

EA V4.1 2/2006

 

BY-2008 Portfolio 9/2006

 

 

VHA Pharmacy Re-Engineering and IT Support   (EA-14)

“Proposed” Health Business Segment

Continuing Milestone-3

Deploy-by: 9/2007

Ex-300(2007)

9/2005

 

Ex-300(2008)

9/2006

 

This Project will provide enhanced patient safety capabilities along with much needed legacy system replacement for VHA pharmacy support functions.

 

The replacement system should interface with the HDR veteran-shared-health-information data store and with the RE-Veterans-Identification data store, providing data sharing and re-use opportunities in both areas.

No Apparent Gap

No Project Consolidation Potential

 

However this project will replace many local legacy stove-piped systems with a national database. 

The national drug file will be updated 52 times per year  (as opposed to the current 5 updates per year) thereby improving the quality of care and patient safety

EA V4.0

5/2005

 

BY-2007 Portfolio 9/2005

 

EA V4.1 2/2006

 

BY-2008 Portfolio 9/2006

 

VHA Appointment Scheduling Replacement      (EA-15)

“Proposed” Health Business Segment

Continuing Milestone-2

Deploy-by: 6/2008

Ex-300(2007)

9/2005

 

Ex-300(2008)

9/2006

 

This Project will reduce the wait-time between booking and executing outpatient health care appointments within the VHA health care system.

 

The replacement system will interface with the HDR veteran-shared-health-information data store and with the RE-Veterans-Identification data store, providing data sharing and re-use opportunities in both areas.

No Apparent Gap

No Project Consolidation Potential

 

This project will create a national system and database which will retire many stovepipe legacy systems

EA V4.0

5/2005

 

BY-2007 Portfolio 9/2005

 

EA V4.1 2/2006

 

BY-2008 Portfolio 9/2006

 

VA-Learning Management System              (EA-16)

“Proposed” Education & Training Services Segment

Continuing Milestone-3

Deploy-by:

2/2008

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/13/2006

 

Utilizes the PMA e-Training Solution

No Apparent Gap 

Consolidates and replaces all local and administration legacy training systems into one national web-portal.

 

Creates a unified training record for all VA training requirements 

 BY-2007 Portfolio 9/2005

 

EA V4.1 2/2006

 

BY-2008 Portfolio 9/2006

 

Patient Financial Services System (PFSS)             (EA-05)

“Proposed” Health Business Segment

Continuing Milestone-2

Deploy by 9/2009

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

No Apparent Reuse Potential

No Apparent Gap

This project will consolidate and replace a variety of legacy  third party billing systems with one standard national system

BY-2007 Portfolio 9/2005

 

EA V4.1 2/2006

 

BY-2008 Portfolio 9/2006

 

The Education Expert System (TEES)             (EA-25)

“Proposed” Benefits Business Segment

Continuing Milestone-3

Deploy-by:

7/2007

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

This project provides a system that will process 90% of all education benefit applications and student status changes without human intervention

 

No Apparent Reuse Potential

No Apparent Gap

No Project Consolidation Potential

 

Replaces legacy education  benefit processing system and dramatically reduces manual processing

BY-2007 Portfolio 9/2005

 

BY-2008 Portfolio 9/2006

 

PIV (EA-62)  VA e-Authentication Solution

(Formerly AAIP)

 

 

 

“Proposed”

Information Services Segment

Not in CPIC

Pre-Milestone 0

 

Unscheduled project recommended by

EA V4.1 &     EA V4.2

 

Deploy-by:

Mid-2009

AAI

Re-Baseline

Utilizes the PMA e-Authentication Solution

No Apparent Gap

No Project Consolidation Potential

 

Process would become a sharable solution to be applied to all VA business lines, stakeholders and application systems

BY-2008 Portfolio 9/2006

 

“FLITE” Financial Management Replacement (Formerly  CoreFLS Re-baseline `-

Project Placeholder Entry)

(EA-40)

“Proposed”

Financial Services Segment

Approved Budget

Re-Baselined

Milestone 1

Deploy-by: 9/2009

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

Possible future use of PMA

 e-Finance Solution

 

 

 

No Apparent Gap

This project will consolidate over many legacy financial systems across VA, replacing them with a single system and data store, capable of consolidated, Department-wide reporting.

 

The following major legacy systems will be replaced

(a) PAID,

(b) FMS;

(c) IFCAP;        (d) AMERS/MRS

Along with 24 lesser systems.

BY-2007 Portfolio 9/2005

 

BY-2008 Portfolio 9/2006

 

MyHealtheVet

Interactive health record management:    (EA-42)

“Proposed” Health Business Segment

Approved Budget Continuing

Milestone 2

Phased Implementation between 2006 and 2011

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

Project will be initially implemented VA-wide with no further potential for reuse

No Apparent Gap

This is new veteran self-service functionality with no project consolidation potential

BY-2007 Portfolio 9/2005

 

BY-2008 Portfolio 9/2006

 

VA e-Travel

Solution

“Proposed”

Memorial Burial and Headquarters Business Segment

Project completed

Milestone 4

In 2006

 

Project in O&M

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

Utilizes the PMA e-Travel Solution

No Gap

No Project Consolidation Potential

By-2008 Portfolio 9/2006

VHA Enrollment Enhancement (EA-63)

“Proposed” Health Business Segment

2008 Budget Requested

Project at Milestone-0

Deployment planned for 9/2012

Ex-300(2008)

9/2006

Will be initially implemented across 1400 VHA health care facilities with no identified potential forfurther reuse

No Apparent Gap

Candidate for consolidation with the One-VA Registration Eligibility Program       (EA-46)

BY-2008 Portfolio 9/2006

VHA Vista Foundation Modernization (EA-64)

Replaces HealtheVet-Vista (EA-41)

“Proposed” Health Business Segment

Approved Budget as HealtheVet-Vista in 2007

Project at Milestone-1

Deployment planned for 9/2010

Ex-300(2008)

9/2006

This is a base level process for healthcare. It will be deployed in 6 regions to support over 150 healthcare facilities

No Apparent Gap

No Project Consolidation Potential

BY-2008 Portfolio 9/2006

VBA Rules-Based Claims Processing   (EA-61)

“Proposed” Benefits Business Segment

Initial Budget Request for BY-2008

Project at Milestone-0

Deploy by 9/2013

Ex-300(2008)

9/2006

This project implements a rule-engine that may be adapted or expanded to support other benefit business lines

No Apparent Gap

No Project Consolidation Potential

 

However this project will replace the claims processing portion of two or more benefit business line systems

BY-2008 Portfolio 9/2006

VA e-Records Management Standardization

Pilot

 

missing-project-placeholder”

“Proposed”

Memorial Burial and Headquarters Business Segment

EA V4.1/V4.2 recommended  Initiative

 

Pre-CPIC

 

Pre-Milestone-0

EA V4.1 Target EA Portfolio Recommendation

 

EA V4.2 Target EA Portfolio Recommendation

Recommended solution:      Utilize the PMA               e-Records-Mgt Solution to implement this requirement

No Apparent Gap

Recommended project would create a unified paper and electronic records management process across VA.  No Department-wide process is currently in place.

 

No Project Consolidation Potential

 

EA V4.1 9/2006

 

EAV4.2 9/2007

VHA Fee-Based Health Care Reimbursement

 

 

”missing-project-placeholder”

“Proposed” Health Business Segment

Unfunded in 2007 & 2008 due to budget cuts

 Milestone 0 Deployment not Scheduled

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

This project will replace the VHA legacy claims processing system that enables VHA to reimburse private hospitals for services that they render to Veterans who are eligible for VHA health care.

 

It may also be possible to satisfy this requirement with a PMA e-Gov claims processing solution. 

No Apparent Gap

No Project Consolidation Potential

EA V4.0

5/2005

 

EA V4.1 2/2006

VHA DSS-Modernization-2006

 

”missing-project-placeholder”

“Proposed” Health Business Segment

Unfunded in 2007 & 2008 due to budget cuts

 Milestone 0 Deployment not Scheduled

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

Utilizes HDR data  and data specifications

No Apparent Gap

No Project Consolidation Potential

EA V4.0

5/2005

 

EA V4.1 2/2006

Seamless Transition

 

 

”Possible Future Requirement”

“Proposed” Health Business Segment

This is not an IT requirement or project at this time.

 

It is a pilot business program which may generate requirements for an IT project at a later date

VA/DoD JEC

2005 Annual Report

Objective ----Collect identification and health care data  from active services members, prior to discharge, across various DoD Medical Treatment facilities and across possibly numerous interview sessions with VA councilor personnel to create a service-member-centric profile for case management across all VA business lines and expedite award of VA benefits once veteran has been discharged

No Apparent Gap

No Project Consolidation Potential

VA/DoD JEC

2005 Annual Report

VA/DoD Health  Collaboration (Patient Sharing)

 

”Possible Future Requirement”

“Proposed” Health Business Segment

This is not an IT requirement at this time. It is a pilot business program which may generate an IT project at a later date

 

VA/DoD JEC

2005 Annual Report

Possible future reuse of DoD-CHCS and VistA

No Apparent Gap

No Project Consolidation Potential

VA/DoD JEC

2005 Annual Report

Cooperative Separation Exam

 

”Possible Future Requirement”

“Proposed” Health Business Segment

This is not an IT requirement atthis time. It is a pilot business program which may generate an IT project at a later date

VA/DoD JEC

2005 Annual Report

May utilize  Bidirectional Health Information Exchange (BHIE), data at a later date

Possible future design of a joint physical examination document

No Project Consolidation Potential

VA/DoD JEC

2005 Annual Report

 

Enterprise Information Layer

Initiative Identification

Reuse, Redundancy & Gap Analysis

Initiative Name

Related Segment Architecture

CPIC-Status Project-Status And Planned Deployment Date

Initiative Information Source & Information Date (Meta-Data)

Identify Potential for Reuse

Identify Potential Gap

Identify Possible Duplication and Consolidation with other Initiatives

Gap/Reuse Information Source & Information Date (Meta-Data)

VHA Health Data Repository Development  (HDR)               (EA-12)

“Proposed” Health Business Segment

Continuing

Milestone-1

Deploy-by: 9/2009

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

This project creates a Sharable data store of  Veteran Health Information for access at any VA Healthcare Facility;

 

This project also creates standard access methodologies for business-Line based Apps to access this data.

 

This health data will be shared across all 1400 VHA health care facilities through interface with the Vista system.

 

 

No Apparent Gap

No Project Consolidation Potential.

 

However, the project eliminates multiple, redundant  occurrences of health data and data collection applications (one per current production instance of Vista)

BY-2007 Portfolio 9/2005

 

BY-2008 Portfolio 9/2006

One VA Eligibility and Registration  (EA-46)

“Proposed” Health Business Segment

Re-Baseline Milestone-1

 

Deployment planned for: 9/2009

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

This project creates a Sharable data store of  Veteran identification data and service history data for use across all business lines;

 

This project also creates standard access methodologies for business-Line based Apps to access this data.

 

No Apparent Gap

  --------------------

Project scope must include:

1) Acquisition of registration data from registration-forms

2) Acquisition of Service History data from DMDC/DIMHRS

3) Development of a registration-data-capture App

4) Data Capture App must support Legacy data feeds as well as new RE-feed until all Legacy Apps are converted.

This RE-project is a candidate for consolidation with the VHA Enrolment Enhancement Project (EA-63)

EA V4.0

5/2005

  

EA V4.1 2/2006

 

EA V4.2   2/2007

Shared Financial Management and Logistics data Store Initiative

 

 

missing-project-placeholder”

“Proposed” Financial Services Segment

EA V4.1/V4.2 recommended  Initiative

 

Pre-CPIC

 

Pre-Milestone-0

EA V4.1 & V4.2 Recommended Project

1) This project would create a Sharable data store of Financial Management data, for use across all business lines;

2) This project also creates standard access methodologies for business-Line based Apps to access this data.

No Apparent Gap

Project would replace and combine s number of Financial/Logistics-Management Systems across VA

EA V4.1

2/2006

EA Proposed Initiative

Shared Asset management & Facility management Data Initiative

 

 

missing-project-placeholder”

“Proposed” Material Management Services Segment

EA V4.1/V4.2 recommended  Initiative

 

Pre-CPIC

 

Pre-Milestone-0

EA V4.1 & V4.2 Recommended Project

1) This project would create a Sharable data store of Asset and facility Management data, for use across all business lines;

2) This project also creates standard access methodologies for business-Line based Apps to access this data.

No Apparent Gap

Project would support and possibly combine various asset management systems across VA

EA V4.1

2/2006

EA Proposed Initiative

 

Platform Enablement Software Layer

Initiative Identification

Reuse, Redundancy & Gap Analysis

Initiative Name

Related Segment Architecture

CPIC-Status Project-Status And Planned Deployment Date

Initiative Information Source & Information Date (Meta-Data)

Identify Potential for Reuse

Identify Potential Gap

Identify Possible Duplication and Consolidation with other Initiatives

Gap/Reuse Information Source & Information Date (Meta-Data)

Windows-XP & Windows-2003-Server

Operating-System

 Migration & Standardization

Information Management Services Segment

Not In CPIC

Funded Through O&M

Deploy XP by 9/2007

CIO Directive

10/04/2005

No Apparent Reuse Potential

No Apparent Gap

No Project Consolidation Potential

EA Project Plan Review 11/2005

VA Enterprise Cyber Security Program (COTS S/W Upgrade & Security Patch Management)

Information Management Services Segment

Project completed

Milestone 4

In 2006

 

Project in O&M

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

Omnibus-Infrastructure-Ex-300

9/30/2006

No Apparent Reuse Potential

No Apparent Gap

No Project Consolidation Potential

BY-2007 Portfolio 9/2005

 

BY-2008 Portfolio 9/2006

IPV6 Transition Program

Information Management Services Segment

Incorporated in Omnibus Infrastructure Budget Request

 

Project  at          Milestone-0

 

Deploy-by:

9/2008

CIO Directive

1/21/2005

No Apparent Reuse Potential

No Apparent Gap

No Project Consolidation Potential

EA V4.1 2/2006

 

EA V4.2 2/2007

 

Shared Infrastructure Layer

Initiative Identification

Reuse, Redundancy & Gap Analysis

Initiative Name

Related Segment Architecture

CPIC-Status Project-Status And Planned Deployment Date

Initiative Information Source & Information Date (Meta-Data)

Identify Potential for Reuse

Identify Potential Gap

Identify Possible Duplication and Consolidation with other Initiatives

Gap/Reuse Information Source & Information Date (Meta-Data)

VA Enterprise

Telephony Agenda

Information Management Services Segment

Continuing

Milestone 0

Deploy by Phase-1 09/07 & Phase-2 12/07

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

Provides an Enterprise-wide Shared Voice Messaging Solution

 

No discernable potential for reuse

No Apparent Gap

No Project Consolidation Potential

By-2007 Portfolio 9/2005

 

By-2008 Portfolio 9/2006

VA Standard

COOP Solution

 Development   (EA-37)

Information Management Services Segment

Incorporated in Omnibus Infrastructure Budget Request

Project  at          Milestone-2

Deploy by 9/2009

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

Provides an Enterprise-wide Shared Disaster Recovery Standard Practice and Resource

 

No discernable potential for reuse

 

No Apparent Gap

No Project Consolidation Potential

By-2007 Portfolio 9/2005

 

By-2008 Portfolio 9/2006

VA Radio

Frequency Transition PMO

Information Management Services Segment

Funding Complete

Project  at          Milestone-4

Deployment occurred in 9/2006

Project in O&M

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

Provides an Enterprise-wide Interoperability Standard and Resource for Emergency Radio Communications.

 

No discernable potential for reuse

 

N/A Project complete

No Project Consolidation Potential

By-2007 Portfolio 9/2005

 

 

Telecom Modernization Project (TMP)

Information Management Services Segment

Funding Complete

Project  at          Milestone-4

Deployment occurred in 9/2006

 

Project in O&M

Ex-300(2007)

9/30/2005

 

Ex-300(2008)

9/30/2006

Provides an Enterprise-wide Shared Resource for Long Distance Data, Image and possibly Voice Networking.

N/A Project complete

No Project Consolidation Potential

By-2007 Portfolio 9/2005

 

 

Exchange (Messaging) Server Consolidation Program

Information Management Services Segment

Phase-I Funding Complete

Phase-II Unfunded Project  at          Milestone-4

Phase-I Complete Phase-II Unscheduled

 

Project in O&M

By-2007 Omnibus Infrastructure Ex-300    9/2006

The first phase Consolidates over 100 disbursed messaging systems into a shared resource complex of 23 centrally managed messaging sites and provides standardized VA e-mail addressing

The second phase will further consolidate this shared service to six sites across the VA intranet.

N/A Project complete

No Project Consolidation Potential

By-2007 Portfolio 9/2005

 

 

Regional Data Processing Center  (RDPC) Initiative       (EA-51)

Information Management Services Segment

Initial Budget Request for BY-2008

 

Milestone-1

 

Deployment planned for 9/2010

Initial Budget Request for BY-2008

Consolidates 128 Exchange e-Mail serves across VA into 24 servers at 23-Regional data centers on the VA intranet. This configuration will consolidate  local servers and workloads for efficiency in management, labor allocation, Continuity of Operations and  into regional centers.

No Apparent Gap

Further server consolidation would be achieved with Phase-II which is currently unfunded.

BY-2008 Portfolio 9/2006

CAN/MAN Network Standardization Initiative

 

”missing-project-placeholder”

Information Management Services Segment

Conceptual Initiative

Pre-CPIC

Pre-Milestone-0

Plan for Mid-2011

EA V4.1

2/2006

EA Proposed Initiative

Project establishes a reusable "Pattern" for  CAN/MAN design and assures a minimum Class of Service Performance across the network distribution layer

Assure CAN/MAN Compatibility with IPV6 Initiative

No Apparent Gap

Project would provide standard Class of Service and Predictable bandwidth and services across VA's regional networks.

EA V4.1

'2/2006

EA Proposed Initiative

LAN Network Standardization Initiative

 

missing-project-placeholder”

Information Management Services Segment

Conceptual Initiative

Pre-CPIC

Pre-Milestone-0

Plan for Mid-2011

EA V4.1

'2/2006

EA Proposed Initiative

Project establishes a reusable "Pattern" for  LAN design and assures a minimum Class of Service Performance across the network access layer

Assure LAN Compatibility with IPV6 Initiative

No Apparent Gap

Project would provide standard Class of Service and Predictable bandwidth and services across VA's Local Area networks;

It would facilitate auto-discovery server and server-application validation and monitoring.

EA V4.1

'2/2006

EA Proposed Initiative

VA-wide RFID-Tagging standardization  Exploitation Initiative

 

missing-project-placeholder”

Information Management Services Segment

Conceptual Initiative

Pre-CPIC

Pre-Milestone-0

Plan for Mid-2011

EA V4.1

'2/2006

EA Proposed Initiative

Project establishes "Patterns" for various RFID-Tagging Applications

 

These Apps would be universally applied across VA.

No Apparent Gap

Project would support expanded use of RFID tagging for inventory control, for management of perishable commodities and for smart-prescription type programs

EA V4.1

'2/2006

EA Proposed Initiative

VA-wide Wireless networking standard

 

missing-project-placeholder”

Information Management Services Segment

Conceptual Initiative

Pre-CPIC

Pre-Milestone-0

Plan for Mid-2010

EA V4.1 Recommended Project

Project establishes "Patterns" for various Wireless Networking Installations which would take Medical facility spectrum restrictions into account

 

Assure LAN Compatibility with IPV6 Initiative

No Apparent Gap

Project would standardize use of wireless devices - primarily within medical facilities.

EA V4.1

'2/2006

EA Proposed Initiative

 

Gap/Reuse Identification Summary

This discussion summarizes the Gap (or, “missing-project-placeholder”) projects described above.  Each of these gap-requirements is described in detail within the following EA Portfolio Recommendations Section, which will be used to recommend new initiatives to the CIO, for the forthcoming BY-2009 budget cycle.

Gap-Issues Resolved in the BY-2008 Portfolio

Several gaps identified in the BY-2007 portfolio that were noted in EA V4.1 were then mitigated by the creation of new projects in the By-2008 portfolio (submitted in September 2006), they are:

  1. The DoD-DIMHRS Integration requirement was identified in EA V4.1 (February 2006) -- this requirement has been incorporated as an unfunded optional task within the VBA/VAMP budget request.
  2. The requirement to integrate the veteran identity data source (created in the Registration-Eligibility project) with existing legacy VBA benefit applications -- has been addressed in the funded base-task within the new VBA/VAMP budget request.

New Gap Issues Identified within the BY-2008 Portfolio

Several new gaps (missing projects) that have developed since publication of EA V4.1 (in February 2006) these gaps are principally the result of budget cuts that occurred within the BY-2007 Pass-Back process; they are:

  1. Reinstitute the VHA Fee-Basis Replacement project that was dropped due to funding constraints in BY-2007.
  2. Reinstitute the VHA DSS Replacement project that was dropped due to funding constraints in BY-2007.

Unresolved Gaps Remaining from the BY-2007 Portfolio

The following gaps (or missing projects), which were identified in EA V4.1, remain unresolved:

  1. VA e-Records Management Standardization Pilot
  2. Shared Financial Management and Logistics data Store Initiative
  3. Shared Asset management & Facility management Data Initiative
  4. CAN/MAN Network Standardization Initiative
  5. LAN Network Standardization Initiative
  6. VA-wide RFID-Tagging standardization Exploitation Initiative
  7. VA-wide Wireless networking standard

These requirements will be described in the following EA Portfolio Recommendations section.