Review of Alleged Mismanagement of Construction Projects at the VA Medical Center in Clarksburg, West Virginia

Report Information

Issue Date
Report Number
15-03231-319
VISN
State
West Virginia
District
VA Office
Veterans Health Administration (VHA)
Acquisitions, Logistics, and Construction (OALC)
Report Author
Office of Audits and Evaluations
Report Type
Audit
Recommendations
5
Questioned Costs
$0
Better Use of Funds
$0
Congressionally Mandated
No

Summary

Summary
The OIG substantiated a Hotline allegation of improper management and oversight of minor, nonrecurring maintenance, and clinical specific initiative construction projects at the Louis A. Johnson VA Medical Center (VAMC) in Clarksburg, WV. The complainant alleged eight construction projects were mismanaged, which led to project cost overruns, delays, cancellations, unnecessary change orders, and additional work. Most significant was a parking garage planned for at a cost of approximately $9.7 million that was reduced from approximately 430 new spaces to approximately 25 new spaces before the project was canceled in March 2016. The VAMC also had to reduce other construction projects in scope because of inadequate planning, and delayed project completion. The VAMC has completed only three of the eight projects; all three cost significantly more than planned. This occurred because of inaccurate cost estimates, untimely performance of site surveys, and failure to ensure project designs were within funding limitations. In total, we identified approximately $2.8 million in unnecessary costs and delays in completing projects needed to serve veterans. Accordingly, we recommended the Veterans Integrated Service Network 5 Director ensure the Louis A. Johnson VAMC implements a plan to use or repurpose the heating and air conditioning system identified by this review; train staff on developing cost estimates and funding requests; and ensure timely performance of site surveys.

Open Recommendation Image, SquareOpenClosed and Implemented Recommendation Image, CheckmarkClosed-ImplementedNot Implemented Recommendation Image, X character'Closed-Not Implemented
No. 1
Closed and Implemented Recommendation Image, Checkmark
to Veterans Health Administration (VHA)
We recommended the Veterans Integrated Service Network 5 Director implement a plan to use or repurpose the heating and air conditioning system identified by this review.
No. 2
Closed and Implemented Recommendation Image, Checkmark
to Veterans Health Administration (VHA)
We recommended the Veterans Integrated Service Network 5 Director ensure the Louis A. Johnson VA Medical Center staff responsible for Independent Government Cost Estimates receive appropriate training.
No. 3
Closed and Implemented Recommendation Image, Checkmark
to Veterans Health Administration (VHA)
We recommended the Veterans Integrated Service Network 5 Director implement procedures to ensure the Louis A. Johnson VA Medical Center staff develop reliable Independent Government Cost Estimates for all construction projects.
No. 4
Closed and Implemented Recommendation Image, Checkmark
to Veterans Health Administration (VHA)
We recommended the Veterans Integrated Service Network 5 Director implement procedures to ensure the Louis A. Johnson VA Medical Center staff develop reliable Independent Government Cost Estimates for all construction projects.
No. 5
Closed and Implemented Recommendation Image, Checkmark
to Veterans Health Administration (VHA)
We recommended the Veterans Integrated Service Network 5 Director establish controls to ensure needed site surveys are performed timely during project planning for construction projects.
Total Monetary Impact of All Recommendations
Open: $ 0.00
Closed: $ 2,785,000.00